Login
Section Engineering

Quality Management System in Asphalt Pavement Toll Widening

Sistem Manajemen Mutu Perkerasan Aspal pada Pelebaran Tol Jakarta Cikampek
Vol. 11 No. 1 (2026): June :

Nadia Laila Lathifah (1), Muhammad Isradi (2)

(1) Program Studi Magister Teknik Sipil, Indonesia
(2) Program Studi Magister Teknik Sipil, Indonesia
Fulltext View | Download

Abstract:

General Background: Quality Management System (QMS) implementation is fundamental to ensuring construction quality in toll road infrastructure projects characterized by technical complexity and active traffic conditions. Specific Background: The Jakarta–Cikampek Toll Road lane widening project requires strict quality control in asphalt pavement works due to high traffic volume, environmental constraints, and operational risks. Knowledge Gap: Previous studies have predominantly addressed quality planning and ISO 9001 audits, while empirical evaluation of QMS implementation in asphalt pavement widening under live traffic conditions remains limited. Aims: This study aims to evaluate QMS implementation in asphalt pavement works and to develop a systematic and measurable Quality Key Performance Indicator matrix. Results: Using a quantitative survey of 70 project stakeholders analyzed through Importance Performance Analysis and SEM-PLS, the findings indicate that environmental and weather constraints as well as material quality fall into high-priority improvement areas, while managerial support shows the strongest positive relationship with implementation quality. Implementation quality significantly determines project performance, with R² values of 0.856 and 0.916 indicating strong predictive capability. Novelty: The integration of Importance Performance Analysis and SEM-PLS produces a practical KPI-based quality assessment instrument tailored to toll road widening projects. Implications: The proposed matrix provides a data-driven evaluation framework for prioritizing corrective actions, strengthening managerial commitment, and optimizing QMS application in asphalt pavement construction.


Highlights
• Environmental and weather constraints require urgent corrective prioritization in pavement works.
• Managerial commitment demonstrates the strongest statistical relationship with execution standards.
• Integrated analytical modeling produces a measurable KPI-based assessment framework.


Keywords
Quality Management System; Asphalt Pavement; Importance Performance Analysis; SEM PLS; Toll Road Construction

Downloads

Download data is not yet available.

References

[1] M. S. B. Abd El-Karim and M. S. A. Abouelela, “The impact of ISO 9001 implementation on construction project performance,” International Journal of Construction Management, vol. 21, no. 7, pp. 705–717, 2021.

[2] R. Agung and B. Sutrisno, “Evaluating quality management in toll road construction projects in Indonesia using IPA and SEM,” Journal of Infrastructure and Built Environment, vol. 7, no. 2, pp. 101–112, 2023.

[3] A. Ali, M. W. Khan, and A. Maqsoom, “Impact of ISO 9001 certification on performance of construction projects,” International Journal of Construction Management, vol. 20, no. 6, pp. 567–576, 2020.

[4] I. Andika, A. I. Rifai, M. Isradi, and J. Prasetijo, “A traffic management system for minimization of intersection traffic congestion: Case Bengkong Junction, Batam,” International Journal of Entrepreneurship and Business Development (IJEBD), vol. 5, no. 5, pp. 945–946, 2022.

[5] J. B. Barney, D. J. Ketchen, and M. Wright, “The future of resource-based theory: Revitalization or decline?” Journal of Management, vol. 47, no. 7, pp. 1783–1799, 2021.

[6] T. Bradiaswara and M. N. Isfahani, “Analisis penerapan sistem manajemen mutu ISO 9001:2015 terhadap kinerja karyawan konstruksi,” Jurnal Teknik Sipil-Arsitektur, vol. 23, no. 1, pp. 49–57, 2024.

[7] R. Cződörová and J. Gnap, “Evaluation of ISO 9001 implementation in transport infrastructure organizations using structural equation modeling,” Transportation Research Procedia, vol. 67, pp. 345–354, 2023.

[8] D. M. Dina and M. Amin, “The effect of toll road SPM service substance on toll road user satisfaction in the Jabodetabek area,” Jurnal Infrastruktur, vol. 9, no. 1, pp. 7–14, 2023.

[9] L. Donaldson and B. N. Luo, “The contingency theory of organizations,” in International Encyclopedia of Human Geography, 2nd ed., 2020.

[10] F. C. Ferdiana, J. U. D. Hatmoko, and B. H. Setiadji, “Pengaplikasian tingkatan sistem manajemen mutu pada proyek konstruksi (quality inspection, quality control, quality assurance, dan total quality management),” Syntax Literate: Jurnal Ilmiah Indonesia, vol. 8, no. 7, 2023.

[11] J. F. Hair, G. T. M. Hult, C. M. Ringle, and M. Sarstedt, A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM), 3rd ed. Thousand Oaks, CA: Sage, 2022.

[12] ISO, ISO 9001:2015 Quality Management Systems – Requirements. Geneva, Switzerland: International Organization for Standardization, 2015.

[13] H. Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 13th ed. Hoboken, NJ: Wiley, 2022.

[14] Kementerian Pekerjaan Umum dan Perumahan Rakyat, Peraturan Menteri PUPR Nomor 10 Tahun 2021 tentang Sistem Manajemen Keselamatan Konstruksi (SMKK). Jakarta, 2021.

[15] Kementerian Pekerjaan Umum dan Perumahan Rakyat, Spesifikasi Umum 2025 untuk Pekerjaan Konstruksi Jalan dan Jembatan. Direktorat Jenderal Bina Marga, 2025.

[16] D. Lestari, D. Rahmawati, and A. Maulana, “Analisis efisiensi material pada cement treated base,” Jurnal Konstruksi Jalan dan Transportasi, vol. 9, no. 2, 2021.

[17] C. Z. Li et al., “A blockchain- and IoT-based smart product–service system for the sustainability of prefabricated housing construction,” Journal of Cleaner Production, vol. 286, p. 125391, 2021.

[18] J. A. Martilla and J. C. James, “Importance-performance analysis,” Journal of Marketing, vol. 41, no. 1, pp. 77–79, 1977.

[19] M. Isradi et al., “Analysis of urban road damage with pavement condition index (PCI) and surface distress index (SDI) methods,” ADRI International Journal of Sciences, Engineering and Technology, vol. 6, no. 1, pp. 10–19, 2021.

[20] N. Novita, A. F. Edriani, and A. Gunawan, “Identifikasi sistem manajemen mutu berbasis ISO 9001:2015 pada perusahaan penyedia jasa konstruksi di Kota Bengkulu,” Teras Jurnal: Jurnal Teknik Sipil, vol. 13, no. 1, pp. 221–234, 2023.

[21] A. E. Oke, D. O. Aghimien, C. O. Aigbavboa, and I. Musonda, “Digitalisation and sustainable construction practices in infrastructure projects,” Sustainability, vol. 14, no. 9, 2022.

[22] PT Indec Internusa, Laporan Analisa Perkerasan: Jasa Konsultansi Review Desain Peningkatan Kapasitas Lajur KM 50 s.d. KM 67 A pada Ruas Jalan Tol Jakarta–Cikampek. Jakarta, 2023.

[23] PT Jasa Marga (Persero) Tbk., Manual Keselamatan Kerja Jalan Tol. Jakarta, 2022.

[24] PT Jasamarga Transjawa Tol, PT Jasamarga Tollroad Maintenance, dan PT Indec Internusa, Rencana Teknik Akhir Pelebaran Lajur Jalan Tol Jakarta–Cikampek KM 50 s.d. KM 67 A dan KM 62 s.d. KM 50 B. Kementerian Pekerjaan Umum dan Perumahan Rakyat, 2022.

[25] Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 7th ed. Pennsylvania, USA: PMI, 2021.

[26] R. Pranata, B. Nugroho, and L. M. Dewi, “Kendala implementasi sistem manajemen mutu konstruksi jalan: Studi kasus kontraktor pelaksana,” Jurnal Manajemen Proyek Infrastruktur, vol. 5, no. 1, pp. 22–30, 2023.

[27] A. Rahman and F. Hidayat, “Manajemen risiko konstruksi pada pelebaran jalan tol di area lalu lintas aktif,” Jurnal Rekayasa Konstruksi, vol. 11, no. 1, pp. 45–53, 2022.

[28] A. Raditya, S. Hardjomuljadi, and M. Amin, “Faktor dampak keterlambatan pembayaran kontraktor kepada subkontraktor pada proyek jalan tol,” Konstruksia, vol. 13, no. 1, pp. 1–16, 2021.

[29] M. Sarstedt, J. F. Hair, J. H. Cheah, J. M. Becker, and C. M. Ringle, “How to specify, estimate, and validate higher-order constructs in PLS-SEM,” Australasian Marketing Journal, vol. 30, no. 2, pp. 100–114, 2022.

[30] Syahrizal, “Pengaruh sistem mutu terhadap kinerja proyek jalan raya,” Jurnal Teknik Sipil, 2020.

[31] B. Suharto, M. Z. Rakhmat, and I. D. Utama, “Evaluasi penerapan sistem manajemen mutu pada proyek jalan tol di Indonesia,” Jurnal Teknik Sipil dan Infrastruktur, vol. 10, no. 2, pp. 85–92, 2021.

[32] D. J. Teece, “Business models and dynamic capabilities,” Long Range Planning, vol. 51, no. 1, pp. 40–49, 2018.

[33] D. J. Teece, “Fundamental issues in strategy: Time to reassess?” Strategic Management Review, vol. 1, no. 1, pp. 103–144, 2020.

[34] A. Wibowo and R. Khoirunisa, “Critical success factors of quality management systems in construction projects,” Journal of Construction Management, vol. 14, no. 3, pp. 211–220, 2022.

[35] S. X. Zeng, H. Y. Ma, H. Lin, R. C. Zeng, and V. W. Y. Tam, “Social responsibility of major infrastructure projects in China,” International Journal of Project Management, vol. 39, no. 4, pp. 329–345, 2021.