Login
Section Engineering

Optimizing Warehouse Flow Through Lean Warehousing Method

Optimasi Aliran Gudang Melalui Metode Gudang Lean
Vol. 10 No. 2 (2025): December:

Raihana Azahra Rusadi (1), Sumiati Sumiati (2)

(1) Program Studi Teknik Industri, Universitas Pembangunan Nasional “Veteran” Jawa Timur, Indonesia
(2) Program Studi Teknik Industri, Universitas Pembangunan Nasional “Veteran” Jawa Timur, Indonesia
Fulltext View | Download

Abstract:

General Background: Efficient warehouse management is crucial for sustaining competitiveness in manufacturing industries, where operational inefficiencies often lead to waste and reduced productivity. Specific Background: PT XYZ, a corrugated box manufacturer in Lamongan, faces persistent inefficiencies in its finished goods warehouse due to wasteful practices such as excessive searching, waiting, and product defects. Knowledge Gap: Despite the widespread application of Lean principles, limited studies have focused on integrating Lean Warehousing to systematically identify and eliminate multiple types of waste within Indonesian corrugated box manufacturing contexts. Aims: This research aims to analyze and reduce warehouse waste at PT XYZ using the Lean Warehousing approach to improve process flow and operational efficiency. Results: Through Value Stream Mapping, Process Activity Mapping, and Fishbone analysis, three critical wastes were identified—searching, defect, and waiting—addressed via FIFO implementation, inspection scheduling, and digitalized planning. The Process Cycle Efficiency (PCE) improved from 64.56% to 83.92%, with significant reductions in non-value-added time. Novelty: This study demonstrates a structured Lean Warehousing framework tailored for local manufacturing, integrating process mapping and digital enhancement. Implications: The findings provide a practical reference for industries seeking measurable waste reduction and productivity optimization through lean-based warehouse management strategies.


Highlights:




  • Identified key warehouse wastes: searching, defect, and waiting.




  • Implemented Lean improvements raised PCE from 64.56% to 83.92%.




  • Proposed digitalized planning and FIFO methods for sustained efficiency.




Keywords: Lean Warehousing, Waste Reduction, Process Efficiency, Value Stream Mapping, Warehouse Optimization

Downloads

Download data is not yet available.

References

M. Siahaan and A. T. Muhidin, “Evaluation of Internal Control System on Finished Goods Inventory at PT Denso Manufacturing Indonesia,” INOBIS: Jurnal Inovasi Bisnis dan Manajemen Indonesia, vol. 3, no. 4, pp. 558–568, 2020, doi: 10.31842/jurnalinobis.v3i4.159.

E. Mulyati, I. Numang, and M. A. Nurdiansyah, “Warehouse Layout Proposal Using Shared Storage Method at PT Agility International Customer PT Herbalife Indonesia,” Jurnal Logistik Bisnis, vol. 10, no. 2, pp. 36–41, 2020, doi: 10.46369/logistik.v10i02.955.

T. R. Diina, S. Sriwidodo, E. S. Nurrasjid, and I. Kustiyawan, “Implementation of Lean Warehousing in Raw Material Warehouse of Pharmaceutical Industry PT XYZ,” Majalah Farmasetika, vol. 9, no. 4, pp. 367–387, 2024, doi: 10.24198/mfarmasetika.v9i4.54864.

I. Komariah, “Application of Lean Manufacturing to Identify Waste in Pan Production Using Value Stream Mapping (VSM) at Primajaya Aluminium Industry, Ciamis,” Jurnal Media Teknologi, vol. 8, no. 2, pp. 109–118, 2022, doi: 10.25157/jmt.v8i2.2668.

A. L. Pratiwi and E. P. Widjajati, “Waste Analysis in Warehouse Flow Process of PT FLSmidth Indonesia Using Lean Warehousing Method,” Jurnal Teknik Mesin, Industri Elektro dan Informatika, vol. 2, no. 4, pp. 124–135, 2023.

R. N. Fauzy and E. Setiawan, “Lean Warehousing Application to Minimize Waste in Finished Goods Warehouse Inline Division of PT Dua Kelinci,” Journal of Industrial Engineering and Operations Management, vol. 7, no. 1, pp. 71–80, 2024, doi: 10.31602/jieom.v7i1.15130.

F. Dzulkifli and D. Ernawati, “Analysis of Lean Warehousing and 5S Implementation in PT SIER Warehouse to Minimize Waste,” Juminten, vol. 2, no. 3, pp. 35–46, 2021, doi: 10.33005/juminten.v2i3.243.

N. G. Ibrahim and Y. Prasetyawan, “Warehouse Evaluation Using Lean Warehousing and Linear Programming Approach (Case Study PT X),” Jurnal Teknik ITS, vol. 9, no. 2, pp. 278–283, 2020, doi: 10.12962/j23373539.v9i2.55529.

M. Y. Efendi and E. Aryanny, “Analysis of Waste in the Warehousing Flow Process with Lean Warehousing Method at PT XYZ,” Tekmapro: Journal of Industrial Engineering and Management, vol. 19, no. 2, pp. 101–110, 2024, doi: 10.33005/tekmapro.v19i2.398.

B. P. Bestari and E. Fatma, “Implementation of Lean Warehousing to Improve Warehouse Activity Performance in Book Printing Company,” Proceedings of Industrial Research Workshop and National Seminar, vol. 1, pp. 160–169, 2020.

N. Fathurohman, “Proposed Standard Working Time in Plain T-Shirt Production Using Stopwatch Time Study Method at Suckseed Convection, Tasikmalaya,” Jurnal Mahasiswa Industri Galuh, vol. 1, no. 1, pp. 31–40, 2020.

A. Latief, P. F. Melu, I. H. Lahay, and Hasanuddin, “Employee Working Time Measurement in Crystal Ice Packaging Using Time Study Method,” Jambura Industrial Review, vol. 1, no. 2, pp. 48–57, 2021, doi: 10.37905/jirev.1.2.48-57.

M. Rahayu and S. Juhara, “Standard Time Measurement for Pen Assembly Using Stopwatch Time Study During Work Design Analysis Practicum,” Jurnal Pendidikan dan Aplikasi Industri, vol. 7, no. 2, pp. 93–97, 2020.

S. Salimah, M. Dzikron, and N. P. A. Hidayat, “Bottleneck Workstation Reduction in Gamis and Koko Clothing Production Using Theory of Constraints,” Jurnal Riset Teknik Industri, vol. 1, no. 1, pp. 49–57, 2021, doi: 10.29313/jrti.v1i1.140.

G. F. Auliya, D. D. Damayanti, and P. P. Suryadhini, “Flow Shop Scheduling Design Using Drum Buffer Rope Method to Minimize Makespan in Textbook Printing Process at PT Thursina Mediana Utama,” E-Proceeding of Engineering, vol. 11, no. 3, pp. 2617–2625, 2024.

D. D. Saputra, “Proposed Application of Theory of Constraints to Optimize Production Capacity at PT XYZ,” Scientific Journal of Industrial Engineering, vol. 1, no. 2, pp. 7–11, 2020.

A. Y. Pradana and F. Pulansari, “Work Time Measurement Analysis Using Stopwatch Time Study to Increase Production Targets at PT XYZ,” Juminten, vol. 2, no. 1, pp. 13–24, 2021, doi: 10.33005/juminten.v2i1.217.

S. Aini, A. Fikri, and R. Sukandar, “Optimization of Food Production Profit Using Linear Programming Through Simplex Method,” Jurnal Bayesian, vol. 1, no. 1, pp. 1–16, 2021.