“Integrated Lean Warehousing Framework Reduces Lead Time in Raw Material Warehouse: Kerangka Kerja Lean Warehousing Terintegrasi Untuk Mengurangi Lead Time Pada Gudang Bahan Baku”. 2026. Academia Open 11 (1): 10.21070/acopen.11.2026.13443. https://doi.org/10.21070/acopen.11.2026.13443.