1.
Integrated Lean Warehousing Framework Reduces Lead Time in Raw Material Warehouse: Kerangka Kerja Lean Warehousing Terintegrasi untuk Mengurangi Lead Time pada Gudang Bahan Baku. acopen. 2026;11(1):10.21070/acopen.11.2026.13443. doi:10.21070/acopen.11.2026.13443