[1]
2026. Impact of Lean Manufacturing and 5S In The Excavator Bucket Repair Process Waste Analysis. Academia Open. 11, 1 (Jun. 2026), 10.21070/acopen.11.2026.13792. DOI:https://doi.org/10.21070/acopen.11.2026.13792.