Ramadhan, R. F., Ernawati, D. and Nugraha, I. (2026) “VSM Reduces Lead Time in Fabrication Material Warehouse Operations: VSM Mengurangi Waktu Tunggu dalam Operasi Gudang Bahan Baku Manufaktur”, Academia Open, 11(1). doi: 10.21070/acopen.11.2026.13491.