Khusna, R. A. and Ernawati, D. (2026) “Lead Time Reduction in Raw Material Warehousing Through Lean Warehouse: A Case Study in a Steel Construction Company : Pengurangan Waktu Proses pada Pergudangan Bahan Baku melalui *Lean Warehouse*: Studi Kasus pada Perusahaan Konstruksi Baja”, Academia Open, 11(1), p. 10.21070/acopen.11.2026.13958. doi: 10.21070/acopen.11.2026.13958.