Ramadhan, Regan Fitra, Dira Ernawati, and Isna Nugraha. 2026. “VSM Reduces Lead Time in Fabrication Material Warehouse Operations: VSM Mengurangi Waktu Tunggu Dalam Operasi Gudang Bahan Baku Manufaktur”. Academia Open 11 (1). https://doi.org/10.21070/acopen.11.2026.13491.