AS ARI, M. H.; ARYANNY, E. Integrated Lean Warehousing Framework Reduces Lead Time in Raw Material Warehouse: Kerangka Kerja Lean Warehousing Terintegrasi untuk Mengurangi Lead Time pada Gudang Bahan Baku. Academia Open, [S. l.], v. 11, n. 1, p. 10.21070/acopen.11.2026.13443, 2026. DOI: 10.21070/acopen.11.2026.13443. Disponível em: https://acopen.umsida.ac.id/index.php/acopen/article/view/13443. Acesso em: 28 feb. 2026.