KHUSNA, R. A.; ERNAWATI, D. Lead Time Reduction in Raw Material Warehousing Through Lean Warehouse: A Case Study in a Steel Construction Company : Pengurangan Waktu Proses pada Pergudangan Bahan Baku melalui *Lean Warehouse*: Studi Kasus pada Perusahaan Konstruksi Baja. Academia Open, [S. l.], v. 11, n. 1, p. 10.21070/acopen.11.2026.13958, 2026. DOI: 10.21070/acopen.11.2026.13958. Disponível em: https://acopen.umsida.ac.id/index.php/acopen/article/view/13958. Acesso em: 7 jul. 2026.