Ramadhan, R. F., Ernawati, D., & Nugraha, I. (2026). VSM Reduces Lead Time in Fabrication Material Warehouse Operations: VSM Mengurangi Waktu Tunggu dalam Operasi Gudang Bahan Baku Manufaktur. Academia Open, 11(1). https://doi.org/10.21070/acopen.11.2026.13491