Khusna, R. A., & Ernawati, D. (2026). Lead Time Reduction in Raw Material Warehousing Through Lean Warehouse: A Case Study in a Steel Construction Company : Pengurangan Waktu Proses pada Pergudangan Bahan Baku melalui *Lean Warehouse*: Studi Kasus pada Perusahaan Konstruksi Baja. Academia Open, 11(1), 10.21070/acopen.11.2026.13958. https://doi.org/10.21070/acopen.11.2026.13958