(1)
As Ari, M. H.; Aryanny, E. Integrated Lean Warehousing Framework Reduces Lead Time in Raw Material Warehouse: Kerangka Kerja Lean Warehousing Terintegrasi Untuk Mengurangi Lead Time Pada Gudang Bahan Baku. acopen 2026, 11, 10.21070/acopen.11.2026.13443.