[1]
Ramadhan, R.F., Ernawati, D. and Nugraha, I. 2026. VSM Reduces Lead Time in Fabrication Material Warehouse Operations: VSM Mengurangi Waktu Tunggu dalam Operasi Gudang Bahan Baku Manufaktur. Academia Open. 11, 1 (Feb. 2026). DOI:https://doi.org/10.21070/acopen.11.2026.13491.