[1]
Khusna, R.A. and Ernawati, D. 2026. Lead Time Reduction in Raw Material Warehousing Through Lean Warehouse: A Case Study in a Steel Construction Company : Pengurangan Waktu Proses pada Pergudangan Bahan Baku melalui *Lean Warehouse*: Studi Kasus pada Perusahaan Konstruksi Baja. Academia Open. 11, 1 (May 2026), 10.21070/acopen.11.2026.13958. DOI:https://doi.org/10.21070/acopen.11.2026.13958.